Examine the lessons learned in implementing a low bid-design-build delivery for two highly visible bridge projects. An aggressive and accelerated project schedule limited the period each bridge needed to be closed. Collaboration was successfully achieved by using innovative partnering strategies. 

Learning Objectives:

1.     Explain low-bid-design build concepts and apply this delivery method to infrastructure projects.

2.     Develop and implement effective project partnering strategies for managing infrastructure projects.

3.     Plan and manage a complex and accelerated construction project and apply the lessons learned by all parties to improve the process.

SPEAKERS:

Adam Dour
Project Engineer,  Edward Kraemer & Sons, Inc.,  Plain,  WI

Dale E. Mejaki, PE
Retired,  Milwaukee,  WI

Jason M. Roselle, PE
Project Supervisor,  State of Wisconsin, Department of Transportation, Southeast Region,  Waukesha,  WI

Contributor/Source

Adam Dour

Claim CEUs

Lorem ipsum dolor sit amet consectetur adipiscing elit, mattis condimentum justo velit convallis taciti faucibus, egestas elementum vitae vestibulum cum fames