Over 100 years ago, a railway was built through seven miles of the Stockbridge-Munsee Reservation's diverse terrain and complex ecosystem, dividing an entire line of wetlands and streams. The impact to ecological integrity was immense. Learn about the design considerations and challenges met during the restoration project to return the creek to its original channel and repair the ecosystem health.

Contributor/Source

Gary Raasch PE

Claim CEUs

Lorem ipsum dolor sit amet consectetur adipiscing elit, mattis condimentum justo velit convallis taciti faucibus, egestas elementum vitae vestibulum cum fames

Related Resources