The application of virtual reality (VR) in design review and contractor bidding processes is transforming the way complex infrastructure projects are executed. This session will explore the significant benefits of integrating VR technology during the design review and contractor bidding phases of complex and multidisciplinary facility projects. By immersing stakeholders—including engineers, contractors, and decision-makers—in a fully interactive, three-dimensional environment, VR enhances communication, reduces errors, and fosters a deeper understanding of the design intent. A pilot project, TxDOT CapEx Pump Station (PS) Facility, will be presented, illustrating how VR enabled a more intuitive review process, allowing participants to explore the pump station layout, assess spatial relationships, and identify potential design conflicts early in the project lifecycle. The use of VR in this project streamlined collaboration during design and improved project efficiency. The CapEx PS Facility is the first stormwater pump station for the Austin district with an overall station capacity of 131,000 gallons per minute. The design of the facility is complex and challenging to grasp using traditional 2D drawings. The 3D model was used to allow project stakeholders a visualization tool for the proposed facility. VR can also be used to simulate how operators and maintenance personnel will access equipment in the pump station, ensuring the design accommodates easy and safe access to equipment. “After this session, participants will be better able to:
• Evaluate how 3D models and virtual reality tools enable stakeholders to detect and resolve design issues such as clashes, misalignments, or inefficiencies at an early stage, reducing costly redesigns and project delays during construction.
• Describe how a 3D model was used in a large facility project to facilitate better communication and joint decision-making.
• Explore the benefits of using technology to engage with non-technical stakeholders during the design, bidding, and construction phase of a project.”

Contributor/Source

Jeremy Gaskins-Director of Technology Solutions, Makenzie Davis-Project Manager

Claim CEUs

Submit this form to claim CEUs.