The City of Phoenix, Arizona evaluates each project and selects the appropriate delivery system based on the highest probability for success. In the last 12 years, they have complete 366 projects using Construction Manager at Risk; 76 projects using Design-Build; and 6000 projects using Job Order Contracting.

Learning Objectives:

1.     Identify the project delivery methods available to project owners in executing capital construction projects.

2.     Evaluate project delivery methods to better understand which methods are appropriate for specific projects.

3.     Describe the advantages and benefits available through use of alternate project delivery methods.

Evan Dale Bingham
GRADUATE RESEARCH ASSOCIATE,  Arizona State University, School of Sustainable Engineering,  Tempe,  AZ

Contributor/Source

Dr. Wylie Bearup, PE, PhD;Evan Dale Bingham

Claim CEUs

Lorem ipsum dolor sit amet consectetur adipiscing elit, mattis condimentum justo velit convallis taciti faucibus, egestas elementum vitae vestibulum cum fames